Near the End of 2017 - This is what I"ve done with my Challenges

I linked to Judy's UFO Challenge for 2017.  Needed to make a list of 12 WIPs. And I decided to do Meredithe's 17 in 2017 also (I've added 5 at the end of the first list - no, I'm not doing 29 -LOL. Button on the side bar).  Here's my report on them - If  I do anything significant in December, I'll update.
1.  Finish this top from Karen at Faeries and Fibres QAL  (Done)

2.  Finish making the blocks of this scrap log cabin. (Made 16 more)


 3. Make more blocks of Anna's Garden (Made 3 more)

4. Complete my Easy Street top  (Move to 2018 list)

 5. Quilt my Riverside quilt. (Top together and sandwiched)

 6. Add leaves to the nine baskets blocks (Move to 2018 list)

7. Finish this fourth Benjamin Briggs block. (Move to 2018 list)

8. Make the remaining two baskets in the center block of LE (Move to 2018 list)

 9. Make more blocks in this Blog Hop project  all blocks made as of 2/28/17! (Move to 2018 list)

10.  Sandwich and quilt my Mod Block Lotto quilt (Move to 2018 list)


 11. Sandwich and quilt my Carolina Christmas top  (Done)


12.  Make more string blocks - need 8 more.   all made and quilt top completed!

The five more for the 17 for 2017 challenge  (hers are every 3 weeks and is asking only for significant progress:
13.  Bonnie's En Provence

14.  Carol's December BOM win    four blocks made for the four too small and top assembled and quilted. Woohoo - Done!

15.  Japanese placemats  (Move to 2018 list)

16.  Crumb block quilt   crumb top assembled and ready to sandwich and quilt. (Done)

17  Women's Voices top.  (Move to 2018 list)

4 Finishes; 5 with significant progress - 8 not touched.  Better than I thought.

17 UFOs (WIPs in my case) in 2017

At the beginning of the year, I committed to two pushes to get projects done.  This month I didn't work so much on my stated 17. I opted to work on others ( I have many - LOL).  Here's where I made progress:

This is actually not a WIP - just got it last week. Quilted this wall hanging for a giveaway at St. Anne's.  It was already assembled.
First time I FMQed metallic thread.  Click on photo to enlarge. Worked good. I circled Baby Jesus' halo, but the angle doesn't let it show.

Closer to closing this ring of hexagons
Made two blocks and the eagle - still work to be done on him.
Assembled my RSC top - still needs a border.

I hope to do some work on my Listed UFOs/WIPs next month, but I'm not holding my breath.
Off to an anniversary lunch with DH - today is our 49th.  Blessings,

Applique Tuesday

I'm almost done with my Anna's Garden block and time to start prepping the next one.
First I make a copy of the pattern and cut out pieces (cutting in the middle of the lines) very carefully to leave me the outline of the block for placement purposes.
 I also label each part so I'll know exactly where they will go back in the placement page.  I start with the ones that will be tucked under other pieces.
All in a bag now and ready for the next step - fabric and freezer paper. Some may think this is a lot of steps, but one at a time, it's not hard at all.  More later.

What are you up to?  Leave me a comment and I'll come by and look at your progress.

I'm linking to Connie's Linky Tuesday.  Go see the links at her party.

Time for SAHRR

  That's Stay At Home Round Robin to those who aren't familiar with this acronym.  Started Jan 14th with a linky party at Quilting G...