Showing posts with label 2017 Quiltathon. Show all posts
Showing posts with label 2017 Quiltathon. Show all posts

February Quiltathon

End of Day 4
Hey - I got to the flimsy stage for the 17 UFOs for 2017 challenge.
She's all put together - phew.  Now to sandwich, quilt and bind.  I think I'll use a dark blue for the binding - or maybe go scrappy as I have a lot of pieces of binding left over.  This now measures 30 1/2" square - just right for a neonatal quilt. And that's as far as I got in the February Quiltathon. I had hoped to work on another block for my other challenge, but had a fun and good interruption during the afternoon.  My DD came over and we worked on three of her projects - so it was sort of a continuation of the quiltathon.  We finished a toddler bed quilt top.  I didn't get a photo of that one.  Then we worked on a set of blocks she had 8 of.  So we made a 9th.
It's the middle one on the top row.  She's now going to assemble them with a nine patch in the corners. Then we moved on to cathedral windows.  It took both of us to figure it out, but we did it.
She was going to make a 16 window piece - she settled for 4 - LOL.
ready for hand stitching during lunchtime.
That's it for this month's quiltathon.  Link up at Judy's to show us your progress.

Day 4
Is there a day #4?  I'll have to go over to Judy's and see.  Well, there is for me as yesterday was a bust as to quilting. So many things came up.  I was in and out of the sewing room all day.  That's what happens when both of us are retired.  And yesterday, I did have to cook something for dinner. Enough nattering.  Here's where I'm at:

Got two rows of the string blocks put together with their side triangles sewn on.  I laid them out a certain way and kept sewing them wrong. That ripper was hot with all the action. Today I'm going to label the remaining ones so I don't have to waste time taking out seams.  As to the #9 I'm suppose to be working on, got the paper templates made.  Need to prepare the background now.

------------------------------------------------------------------------------------
Day 3  Last night's progress - this block is from a kit. Personally I think the fish looks too big. It is what it is.  I'll add some grass along the stream with a bit of thread painting.
On to the next block -also applique.
----------------------------------------------------------------------
Day 1 - 2
I'm late to the session of the monthly Quiltathon at Patchwork Times .  It started yesterday, the 8th, but I was so busy and away from home, I couldn't do much quilting.  Today - the whole morning was taken up with St. Anne's meeting and off to get a lab test. So here it is late afternoon and I can finally begin.  It helps that DH is going early to a plant society meeting so I don't have to cook supper or clean up which will give me more sewing room time. I'm working on two UFOs - one for the Quiltathon and one for 17 for 2017.

For Judy's, who picked the #9, I'm doing applique again.
 I have 27 blocks made for this sampler - just need 5 more to start putting it together. Started in 2010. The fabrics above are drying. Then I'll cut out the shapes and iron them onto the background you see under the paper placement guide.
  For the 17 in 2017, I finished the 8 strings I needed by making them as leaders and enders. I've got the first row of the blocks' triangles sewn on. Once the other three rows are done, I'll be able to sew the blocks together for a preemie quilt for our NICU.  I'll see how much progress gets done by Sunday night because Monday I move onto another UFO. 17 in 2017 is all about progress and we have only 3 weeks each to work on one of the 17. Visit Judy's linking post to see how others are doing.

January's Quiltathon

Day 4 of Quiltathon
Yesterday was spent getting ready for today.  It was busier than I thought, but I did make a small start on my next applique block.  Here it is as the final photo from my first Quiltathon weekend.  

Day 3 of Quiltathon
Started 8th block of Anna's Garden - 6 done years ago.  There are quite a few steps to getting to prepped stage.  The first is making a copy of the pattern.


Then I cut out all the pieces very carefully from the copy leaving a placement page (Zena Thorpe technique).


Then I prepare the freezer paper for making my templates (Pearl Pereira technique)
Take out your TEFLON ironing sheet.  Place paper shiny side down on the TEFLON sheet and iron with a hot iron for about 15 seconds - the paper will shrink a bit.

 Do this to a second piece.  Now place the second paper on top of the first with shiny side of second to the dull side of first.  Iron to fuse together. This should not take more than 15 seconds as you don't want to use up all the stickiness of the piece on bottom, but you want the two pieces to bond.


Let cool and peel off TEFLON sheet. Ready to use for templates.

I then start to pick fabric for the various pieces.  I let the original quilt be a guide to what I choose. After all, it was the photo of the original quilt that enchanted me to want to make mine.

Hopefully, more later - have to go dust and vacuum for tomorrow.
--------------------------------------------------------------------------------------------
Day 2 of Quiltathon

6:53 PM
Finished prepping a block of Anna's Garden (my #3 project in January's UFO challenge).  Tomorrow I'll start on another.

Dinner was easy as I took Judy's advice and cooked ahead.  Made meat loaf and pork stew (aka Goulash) in the days before the quiltathon.  Tonight I'll work on hexagons again.  See you in the AM of Day 3. 

9:27 AM  DH threw a diversion last night so no buds were prepped for the applique block.  He wanted to watch Dark Matter on Netflix, so of course I had to watch with him.  So I hand stitched a hexagon instead.  Doesn't sound like much does it?  It had six pieces and 8 seams so it took a while.

I also finished a green and print one - just not sewn on yet.  Can't do too much sewing right now, have to go to the grocery store for the Sunday event.  When I get back hope it will be warmer in the sewing room. Then I can get to that applique. 

-------------------------------------------------------------------------------------
I signed up for Judy's UFO Challenge for this year.  Today is our first monthly Quiltathon where we sew like mad for a few days to give us a boost in whichever UFO we have to work on.  This is my post for the next few days of my progress - latest report on top.  You can read about this event here.

Day 1
5:09 PM
 Ah, after two batches of cookies and the delivery of a gift to a neighbor, I'm back in the sewing room - clean cutting table!  Got the flowers on my block (it's not so pink - see first photo at 1:13 PM.  After dinner I hope to do the buds, and it will be all prepped. Since I have 18 to go I think I'll prep as many as I can this month and save them for hand appliqueing while watching TV.

1:13 PM



I walked into the sewing room after lunch and realized what my next task was and that was to clear the cutting table after all my En Provence dithering and sewing.  The applique on the right is what I'll be working on next once I've straightened.

11:19 AM

Missing units made.  As soon as I'm off the computer, I'll pack it up.  I'll make the border units another day.  Now going to have lunch and work on the kitchen.  Need to make my grocery list for the luncheon Sunday.

8:18 AM
This is my En Provence units I laid out this morning.  I need to finish some units so I can take it off  my design floor.  I'm hosting this year's Three Kings Day family celebration, so the parts need to go in a box andout of the way.  I chose to make only a fourth of the blocks at each step.  Here they are laid out.  I'll make the missing units and stack them in a container for another day.  Mine is going to be a table topper about 33" square.

Progrees is Made

Progress is made, at least some.  More blocks were added to the baby quilt I was working on (see previous post). More scraps were used. I...