I'm back from last Summer 2019 Vacation.

and almost nothing done with a needle.  What I did do was hand stitch a sleeve to this 2008 quilt.
It's my china plate quilt about 45" by 55".  It would have been longer,  but I forgot to put a white strip above each row of dishes.   Didn't notice till the top was all done.  I quilted the letter N in each center of the plates.  This was a quilt as you go project. Now it can hung on a wall.

So of course my stitching time has changed very little. Here goes:

15 minute days/week = 2/7 days
15 minute days/August = 12/17 days
15 minute days/2019 = 165/231
Success rate = 71.43%

 Destashed .03 yds with that sleeve, so YTD total is now 44.56 yards. I'm linking to Sunday Stash, 15 Minutes to Stitch, and Slow Sunday Stitching.  Hope you did better than I. PS had a great time in Colorado - will report on that this Thursday.  Blessings,

4 comments:

  1. It's a very pretty quilt. Hope your summer vacation was a lot of fun.

    ReplyDelete
  2. Was it really.03 yards? I would have thought more like .33. =) I really like the quilt, and it sounds like you must have had a wonderful August and vacation time, since there was so little stitching time. I look forward to reading about Colorado!

    ReplyDelete
  3. Congrats on a wonderful finish. It just had to come out at the right time to be finished :)

    ReplyDelete

Thank you for stopping by. It's always nice to hear from you. I try to reply to each and every one of you, but sometimes life gets in the way. I hope you understand. Blessings.

All Comes to A Halt

 Sighhhh....  While I was quilting I  ran my finger, somehow, under the needle. Went right through my left index fingernail right through to...