New for This Year

Last year, Jenny of Elefantz had us doing a book study.  This year she has a different theme.
You can find the first post here
I've already found some kitchen towels I can convert.  How about you?  I've nothing on my design wall that I can show, but I'm still linking to Design Wall Monday.

And for my 15 Minutes to Stitch 2020 here is my report:
15 minute days/week = 7/7 days
15 minute days/January = 22/25 days
15 minute days/2020 = 22/25 days
Success rate = 100%
My YTD total has gone from 83.3% to 88% - woohoo!


Some of This; Some of That

First the stitch report for the last two weeks.  I've been able to sew 12 of the past 14 days.  Here's my new stats for Jan 5 -18, 2020:
15 minute days/past 2 weeks = 12/14 days
15 minute days/January = 15/18 days
15 minute days/2020 = 15/18 days

Success rate = 83.3% 
That's an improvement over 75% from the first week.

As to my fabric usage - I've used 0.77 yards in the last two weeks on two projects.  Bought some pieces of yardage, but since I'm using it for the test pattern, and it's not going into my stash, I'm not counting it. So my first YTD total is .77 yards destashed. That's a slow start but it should be picking up fast with the three baby quilt tops I've got waiting for backs.

What have I been doing during those two weeks?  Well, I signed up to be a tester for a pattern designer. Therefore, I can't show you my stitching at this time.  So here's a snack mat from way back in 2015.

This measured 7" square and was for a swap on one of the groups I belong to on Facebook.  Linking to 15 minutes a Day for 2020 and Stash report.  See you there.

Some of This; Some of That 1/6/20

Before I'm more into this New Year, here's my report on 15 Minutes to Stitch in 2020 for the first week Jan 1-4:
15 minute days/week = 3/4 days
15 minute days/January = 3/4 days
15 minute days/2020 = 3/4 days
Success rate = 75%

I"m not worried at that success rate as it was a short week. I'm in line to do better as I'm only having my granddaughter one day a week and watching my grandson after school. More time to quilt!

I already have another baby quilt top done.  This was made from two charm packs that a friend gave me for St. Anne's. I also used a bit of yardage from my stash for the corners.
There's nothing on my design wall as I just took the one above down.  As to goals for 2020, I'm going to work on those five UFOs I didn't get very far with - only finished one.  You can see those here.  Also, I'm going to work on a special project with my friend, Clare.  She lives in New Zealand.  Then I'm going to Quilt Along with the American Quilters' Society. They want to make a quilt each month, and they're not small.  I'm going to use the pattern to make baby quilt tops, so mine will be small. Lastly, I've signed up to be a tester for a wonderful website, but I can't tell you much more about that.  I've gotten my first assignment and I love it!

I'm linking to Design Wall Monday and 15 Minutes to Stitch in 2020.  See you there.




Progrees is Made

Progress is made, at least some.  More blocks were added to the baby quilt I was working on (see previous post). More scraps were used. I...