Some of This; Some of That this Design Wall Monday

Let's start with the destashing:  What with fabric for my last unit on the donut I'm working on for Bliss, a border for the Stars & Stripes sampler, and another baby top, I used 1.3 yards of fabric.  I'm giving 2 yards to St. Anne's, 3 yards to the Guild Friday giving me total of 6.3 yards.  My  new YTD total is  77.04 yds destashed out of the 88 yards needed to meet my goal.  I've passed my 3/4 finish mark!

Here are the last two tops I've made. Second one on my design wall.

Both were made with scrappy blocks using the Bonnie Hunter telephone book paper foundation method. They went together quick and easily. Both are 36" square. Ready to be sandwiched.

I made the first 8 scrap blocks in the first quilt, then taught the ladies of St. Anne's to do them, too.
They made 4 of the second set, and I finished them up.  12 blocks so far for December. Looking at the photos see the second one needs a good 

Lastly, the greetings continue for our 50th.  Look what some friends gave us.  They know I love red.
I'm linking up to Design Wall Monday, Let's make Baby Quilts, Oh, Scrap!, Moving it Forward, and Monday Making.  What are you up to?

I Like Thursdays

We're having another rain spell - we are glad and hope it comes more inland and thus avoid the burned out areas near the coast.  Here are some likes since last Thursday.

Wisteria still blooming, and yes, it still has two colors of blooms.

The Bougainvillea is at it again.

Eager readers after story time.  These are third graders.
Quiltywise, I'm still FMQing my SLOL.  This is going to take some time.  I'm linking to Lee Anna's I Like Thursdays.  Check out the fun posts there. Blessings,

Slow Sunday Stitching

Feels like winter outside, and so I'm hanging out in the living room enjoying the warmth and stitching slowly.  I've finished another unit for my Bliss project.  One more unit and I can attach this donut to the center.  Donut you ask?  That's how I learned to add a round to my hexie centers and use one continuous thread.  Learned it from Karen at Faeries and Fibres.


Making some progress on quilting SLOL - got most of the first row done. It's taking me a bit longer as I keep having to change the top thread.  I couldn't find an all over thread that I liked.

As to destashing, between adding a border to my Stars and Stripes Sampler wall hanging and finding a back for my next baby quilt, I used up 1.3 yards of the stash.  That's because I have been quilting more than piecing. My new YTD total is  71.71 yds destashed out of the 86 yards needed to meet my goal. Very little progress this past week.

And that special luncheon last Thursday?  DH and I went out to celebrate our 50th Wedding Anniversary.  It actually was on the 30th, but we both had so much to do that day, we decided to celebrate on Thursday so we could have a relaxing, no time constraint, lunch.  We tried a new restaurant.  The food was very good and there was no rush. It is called Habanero Mexican Grill .

c. TripAdvisor
Time to prep some more hexies.  I hope you have a fun and productive new week. Blessings,

Oh, yes, I'm linking to Slow Sunday StitchingSunday Stash and Design Wall Monday.


Progrees is Made

Progress is made, at least some.  More blocks were added to the baby quilt I was working on (see previous post). More scraps were used. I...