Judy at Patchwork Times has revamped her annual UFO Challenge to help us get more done. And it will most likely. Having a goal does motivate me to get more done (although I only got 2 of my 12 UFOs done last year). I'm hoping to do better this year. So we're to post 4 things we will get done in the following month. Mine are:
1. Piece the 4 blocks I have left to do for our Guild's Memories of Riverside BOM. Then I'll be ready for when Susan gives us the flimsie directions in February.
2. Make the Easy Street units into a flimsie.
3. Quilt the UFO I finally finished (started in 1997) in the last few days while I've had to sit and keep my leg elevated.
4. Sandwich my Watching All the Birds Go By flimsie
and that's it! Join us - I'd like to know what you want to get done. You can link up to Judy's first Getting It Done party here.
Last 2012 Design Wall Monday
I can't believe this is the last one! They have been so much fun and so inspiring to keep on quilting even if it's only one block at a time, one piece at a time or just 5 minutes of cutting. Thank you Judy!
On my design wall is my second flimsie(for myself that is) for the year. This is the block I started for my first applique class. It was a Zena Thorpe workshop put on by my guild in 1997 - yes, 15 years ago!
I've sandwiched it and is ready to quilt. It will be my first UFO finish in 2013. I hope this is a good sign for the rest of the year as far as ufos go. What's on your design wall? Go on over to Judy's Patchwork Times and check out other walls.
On my design wall is my second flimsie(for myself that is) for the year. This is the block I started for my first applique class. It was a Zena Thorpe workshop put on by my guild in 1997 - yes, 15 years ago!
I've sandwiched it and is ready to quilt. It will be my first UFO finish in 2013. I hope this is a good sign for the rest of the year as far as ufos go. What's on your design wall? Go on over to Judy's Patchwork Times and check out other walls.
Last stash report of 2012!
I'm so glad I did this! I never would have thought I would use a little over 142 yards in a year. And while I know I gave a lot of fabric away to my guild and St. Anne's I was pleasantly surprised that in 2012 I made 8 quilts - 6 of which I gave away; finished 12 charity baby quilts; 12 charity flimsies; quilted three quilts for others; made 7 quilts for our VA hospital; pieced 62 blocks - some will be orphans, some are already in quilts, some are part of BOMs I haven't finished, some for swaps; created one flimsie for me and started 3 NewFOs
Here are my numbers:
Used/Donated last week: 0.7 yards
Used/Donated YTD: 180.86 yards
Added/Bought last week: 0.0 yards
Added/Bought YTD: 38.79 yards
Net Decrease YTD: 142.07 yards Next year I'm going to add a line to my numbers report that will read Donated and Donated YTD. Then I'll really know how productive, or not!, I've been. It's all fun. Hope you join in with Judy at Patchwork Times What's my goal for next year - 150 yards. What's yours?
Subscribe to:
Comments (Atom)
Progrees is Made
Progress is made, at least some. More blocks were added to the baby quilt I was working on (see previous post). More scraps were used. I...
-
October is behind us. Does that put us in the Winter months? I think it does. The skies have been foggy in the mornings - a thick fog that...
-
Progress is made, at least some. More blocks were added to the baby quilt I was working on (see previous post). More scraps were used. I...
