Some of This; Some of That - Missing in Action

 Yes, I've been missing in action, because I have been busy doing quilty stuff each day except two and coping with the rest of life. So for the past four weeks, my productivity has been 87%, 100%, 87%100% for an average of 93.5%.  That's my 15 Minutes to Stitch report.

As to the destash - not so good as all I'm working on is not that big.  These hexies


with 2" sides take about a 4.5" square for each of them.  The 20 I've made only add up to a little over a 1/4 yd. or  0.27 yd.  I made a pillow cover for a friend. That took 0.21 yd.  Then I made Arrow Rock Sampler blocks - that took 0.18 yd and 0.13 yd to give me 0.79 yd.  Then I got rid of a piece of yardage - though I loved the colors - it was gauze when I finally examined it for another 1.14 yds for a grand total of 1.93 yds out. So my YTD total is 35.98 yds.  If I make it to 50 by year's end I'll be happy with half of my goal accomplished in this crazy year.

So here are some photos: 

All the sampler blocks on my design wall:


The Hexie bits and pieces joined to center - deep blues and blues and yellow new:

This is getting too big to photograph without climbing up on a ladder.  I'll try it on the design wall next time.

And the pillow case - fused a handkerchief to the top of the pillow top, and quilted it, sewed the back and front together. Pretty fragile hanky.



I'm linking to 15 Minutes to StitchCan I get a Whoop, Whoop?Oh, Scrap!Stash Report, and Design Wall Monday.  See you there.

Some of This; Some of That 9/7/20

 Played with fabric every day for at least 15 minutes - 100% for 15 Minutes to Stitch

Made blocks for the sampler and the hexi project using 0.25 yd bringing me to a YTD total of 34.05 yds

So here are the photos:

The Hexi project (check previous posts for info on the QAL):


I've added the flower on the left and then I started on the latest section with the two dark blue and yellow hexies you see here.  Again it took me forever to decide on the fabrics.  Now I only have to make 10 more during this week to be caught up - hahahahaha.

The other project I worked on was the sampler. I realized as I was lamenting how far behind I am that I actually have all the pieces for row one. To make me feel better, I put that row together.  Ahhhh.


Why did I start two projects at the same time??  Just crazy I guess - I'm going to blame COVID for it.

So this is what my design wall looks like:



I'm linking to 15 Minutes to StitchCan I get a Whoop, Whoop?Oh, Scrap!Stash Report, and Design Wall Monday.  See you there.


Some of This; Some of That 8/30/20

 Not much growth on the destashing this week.  Just finished up some blocks for my two WIPs I started not long ago.  I only used 0.17 yd of scraps to complete two blocks for the Arrow Block sampler and prep the next hexagon for the Hexie Love Studio Quilt Along. That gives me a YTD total of 33.80 yards.

Here are the blocks for the Arrow Rock Sampler on my Design Floor:

From Part one
From Part Two

and then the HLSQAL

Have got three assembled and have four to sew on to complete the next unit. That will be my hand stitching for this evening. And here is how it looks so far with last week's work added to the right of center:


Ugh, why can't I get a focused photo?  The new ring will go on the left.  I'm not as far behind as I was last week.  I'm Seriously behind on the Arrow Rock Sampler!

I'm linking to 15 Minutes to StitchCan I get a Whoop, Whoop?Oh, Scrap!Stash Report, and Design Wall Monday.  See you there.

June's Blog Post

  I didn't mean for a quarter to pass by before I posted again, but that's what happened! Let see if I can summarize all that I been...