Very busy babysitting - two twelve hour days and then this weekend all four of them for three days -makes for very little quilting but lots of fun. And for three days I was able to do a lot toward piecing my BOM quilt. I used 1/4 yard to make handles for my tote and .61 yards toward the white outer border for all the 12 blocks plus 1 yard for inner sashing, 2/3 yards for first border and 2 yards for outer border - I have to cut the last border on the length. Here are my numbers:
This week: in 0.0 yds.; out 4.53 yds.
Stash
YTD:
in 3.0 yds.,
out 18.63 yds.
Donated
this week: 0.0 yds; YTD: 8.09 yds
Net for 2013:
out 15.63 yds.
Here are my two two-year-olds playing together in January. Lily is 7 months older than Alan. I'm linking over to Judy's
Patchwork Times and Lyn's
BOMs Away. Check out all those links.