Fabric Tuesday - Wow

Well the first row is quilted.  I will do the sashing between them and below the first row after I add the second row.  Here on the right, you see it pinned ready to be sewn. 
Once that's done, I'll repin-baste the new row so that I don't have any wrinkles on the back.  It's back to the floor to do that.  I'll have to look into getting a table to do the basting as Cindy Needham recommends in her Craftsy class.

What's your fabric story - Wow this week?  I'm linking to Connie's Free Motion by the River and Esther's WOW.  See you there!

Design Wall Monday 3/18/13

I'm babysitting tomorrow -all day, so I'm posting this early.  Up on my design wall is the next row of the BOM quilt waiting to be attached to the QAYG sandwich - no joining strips on this one and a solid backing. Here's what I did Sunday:
I took the sandwich part to the machine.  Here it is as I got ready to start earlier today.  As you can see I don't have a lot of quilt around the machine.  It's amazing how less there is to push around with only have of the batting in the way.  I decided to echo quilt a few times around the cross and quilt cloud shapes in the sky.  Since our Mt. Robidoux is rocky, I made large pebbles on the mountain.
Here you see that finished block and the next one I have to work on.  I decided to make wavy lines on the sky to denote wind and straight lines with an occasional plant in the beige areas to represent our semi-desert terrain around Riverside.  The diagonal element is the Gage canal that runs through the region and brought water to the Riverside orange groves.  Last to do is the Navel orange - first grown in Riverside.

What's on your design wall?  Go on over to Judy's Patchwork Times and Lyn's BOMs Away and see what others are working on. 

Stash Report 3/17/13

Happy St. Patrick's Day!  I have a good number to report.  I used 5 yards for the back of my BOM quilt - 150% more than the average I need per week to meet my goal at year's end.  Here are my numbers: 
This week:  in 0.0 yds.; out   5.00 yds.
Stash YTD: in 3.0 yds., out 23.63 yds.
Donated this week: 0.0 yds; YTD: 8.09 yds
Net for 2013: out 20.63 yds.

I'm moving along! 

And now what I got done yesterday.   You saw the back I made on the last post.  Here is the start of my QAYG for this quilt:
 First, I measured and calculated how big my batting had to be based on the back I had just made. To lessen the bulk of this quilt so I can more easily quilt it, I cut the batting in half horizontally.  Then I laid down the back which I had ironed and smoothed the top half of the batting on the top half of the back. I then pin basted the back and batting to the carpet so that it would be smooth.  Next I finger pressed the center of the first row that has the first sashing row attached to it. I then placed it on the center mark of the batting making sure it was the 10" all across the top to allow for the borders I will add later(plus 2" extra of batting and back). I then pin basted the row to the sandwich.  Here it is all basted with the back showing at the bottom.  Ready to quilt!
 

Time for SAHRR

  That's Stay At Home Round Robin to those who aren't familiar with this acronym.  Started Jan 14th with a linky party at Quilting G...