All the vertical sashings are done. Now working on the horizontal joining sashing. Little by little.
And today I slow stitched on a hexie as I waited for my mom at the doctors.
Then working on my commission quilt. Machine quilting the symbols. I didn't like the zig-zag for these, so doing them with straight stitch, but a straight stitch done with FMQ. Straight stitch on left.
If I had my druthers, I'd have machine appliqued these before starting the assembly of the quilt. Limited to how these can be stitched down otherwise.
Once those are done, got started on stitching in the ditch to anchor the blocks.
This will be a slow process - not due until Dec 18th and I have two sets of out of town visitors starting Nov 25th. I'll be happy to get to do 15 a day.
Still reading the Guernsey book. And from the garden, the last of the flowers for now:
What are you up to? Leave me a comment and I'll come see your eye candy!




